TEYU S&A CWFL-12000 fibre laser water chiller
TEYU S&A CWFL-12000 fibre laser water chiller
CWFL-12000 fibre laser water chiller view 2
CWFL-12000 fibre laser water chiller view 2
CWFL-12000 fibre laser water chiller view 3
CWFL-12000 fibre laser water chiller view 3
CWFL-12000 fibre laser water chiller view 4
CWFL-12000 fibre laser water chiller view 4
TEYU S&A CWFL-12000 fibre laser water chiller
CWFL-12000 fibre laser water chiller view 2
CWFL-12000 fibre laser water chiller view 3
CWFL-12000 fibre laser water chiller view 4

TEYU S&A CWFL-12000 Fibre Laser Water Chiller

Contact us for pricing

Request a written quotation including delivery to your address.

Thanks for contacting us. We'll get back to you as soon as possible.

Enter your delivery details so we can quote the equipment and freight together. Fields marked * are required.

TEYU S&A CWFL-12000 fibre laser water chiller
Contact and delivery details

The TEYU S&A CWFL-12000 is a dual-circuit industrial water chiller developed for fibre laser systems up to 12 kW. Separate temperature-control circuits cool the laser source and optical components simultaneously, supporting stable, efficient laser operation.

Key features

  • Dual independent cooling circuits for the laser source and optics
  • ±1°C temperature stability
  • 5°C to 35°C temperature-control range
  • Intelligent digital controller with integrated alarms
  • RS-485 Modbus communication for compatible laser systems
  • Active refrigeration using R-410A or R-32 refrigerant
  • Back-mounted fill point and visible water-level indicator

Technical specifications

Recommended laser power Up to 12 kW
Australian supply configuration AC 3-phase 380 V, 50 Hz (CWFL-12000ENPTY)
Nominal cooling capacity 35 kW / 119,424 BTU/h
Temperature stability ±1°C
Tank capacity 170 L
Rated flow 2.5 L/min + greater than 100 L/min
Pump power 2.2 kW
Maximum pump pressure 7.5 bar
Dimensions 1,450 × 800 × 1,320 mm (L × W × H)
Net weight 293 kg
Manufacturer standards CE, REACH and RoHS

Product video

Specifications should be confirmed for the final supplied machine.